LYCOS RETRIEVER
Td Canada Trust
built 212 days ago
On May 14, 2003 the first TD Canada Trust Thunder Bay High School Math Competition took place with just under a hundred students from local high schools. The contest was an all day contest split into two parts: an individual component and a team component. The results from the contest are posted below.
Source:
Working with Microsoft, TD Canada Trust began building the solution on-top of existing back-end infrastructure, with minimal disruption to the department’s day-to-day activities. Built on an HP 64-bit platform, the solution was capable of processing 30 gigabytes of new data each month.
Source:
TD Canada Trust is using User-Agent matching against a local whitelist in an attempt to determine if the user requesting the login page is infected with spyware. Users who present a User-Agent header not present in their whitelist are presented with an image informing them that their machine is infected with spyware, and that they should remove it before continuing.
Source:
To provide optimum value to TD Canada Trust, the retail risk management team realized it needed to find a speedier method for collecting risk data and compiling reports. The team wanted a complete technology solution that would reduce the amount of manual intervention necessary to develop the reports, and provide the computing power to develop reports as quickly as possible.
Source:
Email asks you to confirm/update/verify your account data at TD Canada Trust by visiting the given link. You will be taken to a spoof website where your details will be captured for the phishers.
Source:
TD Canada Trust Tower is an office tower in Calgary, Alberta. Located at 421 7th Avenue SW, it stands at 162 m (531 ft) or 40 storeys tall. It was designed by WZMH Architects in postmodern style and was built by PCL Construction in 1991. It has a total area of 65,000 m² (699,654.2 sq ft) and is serviced by 15 elevators.[2] The building is managed by Oxford Properties Group.[1]
Source: